States
Bank 2003
Sanctuary
Dates Planted
6/18 – 0.4 m, 8/1 – 2.6 m,
10/14 – 2.0 m

Total UMCES
5.0 million of various broods

Acreage
23 acres

Site Preparation
• Bar cleaned 4/30 -5/7/03 by MWA
• Planted with stone material, stone gabion
(4-8 ‘’ diameter) planted
flat ~ 3inchesover 23 acres,
8940 cyds
• Bottom Survey conducted by MGS March 13

Project Supporters
UMCES, MWA, DNR, NOAA, ACOE, CFE
Disease
Data (UMCES Paynter Labs) |